
In addition this manual provides guidance on how to avoid and solve problems during installation. Introduction This manual is written as a guide for supervisors and field engineers and explains the possibilities of Wavistrong systems. resistance Electrically conductive pipe Wall penetration and connection to or through walls Field test procedure Filling, saturation and testing Causes of pressure drop Safety precautions 60 4Ħ 1. Installation of underground systems The trench construction Pipe assembly Backfilling Other methods of backfilling Pipe systems to be cast in concrete Subsidence Relief plates Installation of underwater mains Hydrant connections Installation of above ground pipe systems Supports Protection of the pipe Extra supports Fixed supports Pipe clips Valves Bellows Connection to other materials Algae growth U.V. Jointing and preparation methods of Wavistrong Cutting Adhesive bonded joints Tools for adhesive bonded joints Machining Bonding of the joint Installation time for adhesive bonded joints Allowable bending radius Integral Rubber seal joint (RSJ) and Rubber Seal Lock Joint (RSLJ) Tools for rubber seal joints Rubber Seal Joint Rubber Seal Joint (RSJ) with pipe stop Rubber Seal Joint (RSJ) without pipe stop Rubber Seal Lock Joint (RSL J) with pipe stop Rubber Seal Lock Joint (RSL J) without pipe stop Dimensions of rubber ring and locking strip Installation time for rubber seal joints Disassembly of rubber seal joints Flanged joints Tools for flanged joints Flanged joints Gaskets and maximum torques Torques for assembly of rubber gaskets with steel insert Torques for assembly of rubber gaskets with supporting ring Assembly and disassembly of flanged equipment Determination of the bolt lengths Butt and wrap joints Tools for butt and wrap joints Cutting and shaving Mixing Fit layer Laminating Curing Mechanical couplers Tools for mechanical couplers Mechanical couplers 32 3ĥ 9. material: Transport and storage Loading Unloading Storage of material 8 3.


Introduction Systems Series identification 5 2. No part of this work may be reproduced in any form, by print, photo print, microfilm or any other means without written permission from the publisher. We accept no responsibility for the interpretations of statements made. However, we reserve the right to alter, amend and update any products, systems and services described in this brochure.

1 Future Pipe Industries WAVISTRONG INSTALLATION MANUAL WAVISTRONG FIBERSTRONG WAVIFLOAT FIBERMARĢ Wavistrong Installation Manual REP 320/REV 02/0401 Date of issue: Replaces issue:ģ All information was correct at the time of going to press.
